夜色撩人在线观看,欧美人禽杂交狂配,日本肉体xxxx裸体137大胆,亚洲一区av在线观看,性做久久久久久免费观看,国产精品久久久久久人妻无,人妻天天爽夜夜爽一区二区,99久久精品费精品国产

Chinese

ENGLISH

Xing Sheng

Contact Us

河北興盛塑料管業有限公司

Website     :www.nouqu.cn

Contact     :Manager Zhang

Phone       :13933323655

Mail          :hbxsslgy@163.com

Buy online:https://shop377465757.taobao.com/

Common problem Common-problem
Notes for installation of plastic flange
Plastic pipe in construction, often use plastic flange and cast iron flange, iron valve and other pipe butt. Our flange basically has two kinds: one kind is Φ injection under 315 flange (a socket and adhesive), another is by welding, glass fiber reinforced plastic composite of various specifications of the socket flange, butt should first consider both flange and butt joint of flange standard is unified, pressure levels are the same. Now the implementation of the standard is basically the use of national standards, users sometimes also use metallurgical Ministry or other standards of flange. The grade of village force is generally 1.0mpa, 1.25mpa, 1.6mpa and so on. Only choose the same standard, the same pressure class flange butt when the size of the outer circle, hole distance can be matched.

The injection molding adhesive flange of my company is also called retainer flange, by flange sealing gasket, flange sealing piece, flange three parts are composed, injection molding flange in addition to refer to the book 27 "plastic pipe, pipe fitting how to bond?" Besides, attention should also be paid to the following aspects:
 
1. Before bonding, first of all, cover the loosed flange flange in the middle of the pipe, and then the flange seal shall be bonded, otherwise, the flange seal will be stuck in after bonding, (one end is Reuters material expansion mouth, and the other end is the bonded seal).
 
2. Set the flange in the correct direction; Because the two sides of the sleeve flange are not the same, (one side is flat, one side has a groove) so the force direction is restricted, the side with a groove should be toward the other side of the butt flange, and after bonding to solidify to a certain time before fastening the bolt.
 
When connecting FRP composite flanges with other flanges, it is necessary to consider whether the direction of screw hole is appropriate. For example, the flange on one side has been connected to the pipeline, and the composite flange plate connected after the connection must be relative to the flange hole connected first, otherwise the screw hole is misaligned and the bolt cannot pass through.
 
When fastening the bolt, whether it is injection molding flange or fiberglass composite flange, it should be noted that the flange axis should be on the same horizontal line, both sides of the flange should be perpendicular to the pipeline, the gap is uniform, the bolt should cover the gasket to increase the contact area, the bolt fastening to symmetrical force, to ensure the ideal sealing effect.

  • Official Website

  • Taobao Shop

  • Wechat Account
主站蜘蛛池模板: 四房播播网站| 亚洲av永久天码精品天堂dl| 一区二区精品视频日本| 色噜噜噜亚洲男人的天堂| 亚洲精品美女久久久久99| 玩弄japan白嫩少妇hd小说| 一本之道中文日本高清| 人妻av中文系列| 色婷婷亚洲精品综合影院| 欧美屁股大的xxxxx| 女人高潮特级毛片| 成 人 免费 在线电影| 人妻夜夜爽爽88888视频| 日韩精品中文字幕无码一区| 国产熟女乱子视频正在播放| 国产美女久久精品香蕉| 久久久精品人妻久久影视| 小13箩利洗澡无码视频网站| 色香阁综合无码国产在线| 最好免费观看韩国日本| 久久久国产精品亚洲一区| 国产成人一区二区三区影院动漫| 老熟妇性色老熟妇性| 超薄肉色丝袜一区二区| 国产av无码专区亚洲版综合| 小sao货揉揉你的奶真大电影| 亚洲热妇无码av在线播放| 中文字幕人妻无码视频| 亚洲精品av一区二区黑人| 亚洲乱码国产乱码精品精| 亚洲色欲色欲综合网站| 网曝黑料猛料吃瓜网| 国产偷自一区二区三区| 高h喷水荡肉爽文np肉色视频| 欧美黑人巨大videos| 又色又爽又黄高潮的免费视频| 国产小受呻吟gv视频在线观看| 伊人色综合久久天天五月婷| 蜜桃成熟时1997| 五十路熟女一区二区三区| 野花社区视频www|